水沟电缆槽移动模具包括行走系统及定位系统 |
添加时间:2019/12/24 13:43:39 浏览次数: |
水沟电缆槽移动模具包括行走系统及定位系统。在行走钢轨上安装好水沟电缆槽台车的各个部件,调试好后可以快速施工水沟电缆槽。 The moving die of the ditch cable trough includes a walking system and a positioning system. Install all parts of the trench cable trough trolley on the traveling rail, and quickly construct the trench cable trough after debugging. 该水沟电缆槽移动模具长12m,与衬砌台车长度一致,确保每环水沟电缆槽施工缝能与衬砌施工缝一致,能确保仰拱沉降变形后不会拉裂水沟电缆槽。 The length of the moving mould of the trench cable trench is 12M, which is consistent with the length of the lining trolley, to ensure that the construction joint of each ring trench cable trench is consistent with the lining construction joint, and to ensure that the trench cable trench will not be cracked after the settlement and deformation of the inverted arch. 该模具可循环使用,简单环保,4人操作,月进度平均360m,最高月进度可达500m。 The mould can be recycled, simple and environmental friendly, operated by 4 people, with an average monthly progress of 360m and a maximum monthly progress of 500m. 二、适用范围 2、 Scope of application 适用于隧道水沟电缆槽施工。 It is applicable to the construction of cable trough in tunnel ditch. |
上一页 电缆槽盖板模具技术要求 |
下一页 缝隙式排水沟盖板的设计介绍 |
Copyright © 技术支持:遨游网络