电缆槽盖板模具技术要求 |
添加时间:2020/8/14 15:55:36 浏览次数: |
电缆槽盖板模具技术要求 Technical requirements of cable tray cover die (1):槽体构件尺寸在满足使用功能的同时高和宽相对减小,减少工程的土石方挖掘量、节省工时、加快工程进度; (1) The size of tank body components can meet the use function, while the height and width are relatively reduced, which can reduce the amount of earthwork excavation, save man hours and speed up the project progress; (2):槽与槽之间连接缝隙很小,连接的过程中不需要抹灰,有泄水作用; (2) : the joint gap between grooves is very small, and there is no need for plastering in the process of connection, which has the function of water discharge; (3):构件采用高频振动、高压压制而成,具有密实度高、韧性好的特点;电缆槽可打泻水孔;侧壁可打孔有利于接线盒的固定安装; (3) : the components are made by high frequency vibration and high pressure pressing, which have the characteristics of high density and good toughness; the cable trough can be drilled with drain holes; the side wall can be drilled to facilitate the fixed installation of the junction box; (4):电缆槽边角的R型设计,内部采用钢纤维为加强筋,分散性好、对混凝土的裹附力加强,这些都可有效避免构件掉边掉角; (4) In the R-shaped design of cable trough corner, steel fiber is used as reinforcing bar inside, which has good dispersibility and strong binding force to concrete, which can effectively avoid edge and corner falling of components; (5):电缆槽在整个工程中采用同一模具制作,保证了构件尺寸的规整统一性,使精品工程得到保障; (5): the first mock exam is made of the same mould in the whole project, which ensures the integrity and uniformity of the size of the components, and ensures the quality works. |
上一页 管廊模具的发展历程 |
下一页 水沟电缆槽移动模具包括行走系统及定位系统 |
Copyright © 技术支持:遨游网络